Cases

16 PARALLEL PROJECTS
200000 TOTAL TEST QUESTIONS
6000000 TOTAL DATA FIELDS
60 TOTAL USERS
10 DICIPLINES
Pioneering Spirit



Heijningen










Allseas

Project

Pioneering Spirit Top Lift System

Challenge

How to record and process (commissioning) data between disciplines like engineering, Production and Commissioning and their role in the different project phases to certify the Top Lift System.

The Allseas Pioneering Spirit is a dynamically positioned vessel for single-lift installation and removal of large offshore oil and gas platforms, and the installation of oil and gas pipelines. The twin-hulled vessel is 382 m long and 124 m wide. At the bow is a slot, 122 m long and 59 m wide, that enables to straddle a platform and remove entire topsides of offshore platforms in a single lift using eight sets of horizontal lifting beams called the Top List System (TLS). TALT was hired to record, process and report TEST-data during the commissioning phase of the TLS.


Chugoku Paints

Project

Maintenance control paint fabrication

Challenge

Record ands process planned and unplanned maintenance issues




Global Electrical Solutions

Projects

Commissioning of maritime and offshore installations

Applied at

  • Koningklijke Marine
  • Damen Shipyards

By www.globalelectricatsolutions.nl



D-Tacs

Projects

Commissioning and testing on-shore installations

Applied at

  • ABNAMRO Foppingadreef

By www.D-Tacs.com